Executive Summary
The 17 IPO monitoring agency reports for Q2FY27 reveal a market where capital is being raised at a record pace but deployment is lagging, with an aggregate unutilized corpus exceeding ₹700 crore across the sample.
A clear pattern of front-loaded working capital deployment and delayed capex is evident, with 6 of 17 companies reporting zero or negligible capex utilization in the quarter, including Hero Motors (₹200 crore object untouched), Sonaselection (₹50.61 crore capex at zero), and SS Retail (₹124.53 million fit-out capex at zero). Compliance quality is mixed: three companies (Recode Studios, Hero Motors, Sonaselection) reported deviations from stated objects, primarily due to parking of unutilized proceeds in current accounts or overdraft facilities rather than designated bank deposits, while Maharaja & Speedex and Technocraft Ventures flagged verification gaps and missing board approvals. Financial performance data is sparse, but Aten Papers & Foam stands out with 51.4% YoY revenue growth that came at the cost of 130 bps PBT margin compression and negative operating cash flow, highlighting a growth-quality trade-off. The overall sentiment is cautious-neutral, with 4 filings tagged 'mixed' due to compliance deviations or profitability concerns, suggesting that while IPO activity remains robust, post-issue utilization discipline and operational execution are emerging as key differentiators for investors.
Materiality, sentiment, and priority are scored by Gunpowder’s analysis pipeline. How we score filings →
Filing types in this digest: IPO
Tracking the trend? Catch up on the prior India IPO SEBI DRHP Activity Filings digest from November 06, 2026.
Investment Signals (12)
- Aten Papers & Foam ↓ (BEARISH)▲
Revenue surged 51.4% YoY to ₹10,107.06 Lakh in H1FY27, but PBT margin compressed to ~3.4% from ~4.7% and EPS declined to ₹2.53 from ₹2.56, indicating growth is being purchased at the expense of profitability
- Hero Motors ↓ (NEUTRAL)▲
Utilized ₹189.84 crore (31.6% of IPO proceeds) for debt repayment within the first quarter of listing, reducing interest burden, but ₹383.16 crore (63.9%) remains unutilized and ₹200 crore capex object saw zero deployment
- Technocraft Ventures ↓ (BULLISH)▲
Front-loaded ₹139.98 crore (93.3% of ₹150 crore target) of working capital deployment into Q2FY27, demonstrating aggressive operational ramp-up post-IPO
- Belrise Industries ↓ (BULLISH)▲
Fully utilized the debt repayment object at ₹15,960.21 million (74.2% of gross proceeds) within five quarters of its May 2025 IPO, significantly de-risking the balance sheet
- Globe Civil Projects ↓ (BULLISH)▲
Achieved 100% utilization of its ₹119 crore IPO proceeds with no deviation, and deployed ₹4.69 crore in Q2FY27, reflecting strong project execution and capital discipline
- Safety Controls & Devices ↓ (BULLISH)▲
Deployed ₹31.42 crore (99.7% of the ₹31.50 crore working capital target) within two quarters of its April 2026 IPO, indicating efficient working capital management for its EPC business
- SS Retail ↓ (NEUTRAL)▲
Fully utilized ₹797.54 million of General Corporate Purposes within the first quarter of listing (September 2026), but zero utilization of ₹124.53 million fit-out capex for new stores raises questions on expansion timeline
- Sonaselection India ↓ (NEUTRAL)▲
Over-utilized the borrowing repayment object at ₹85.16 crore against the stated ₹80.00 crore (a 6.45% variation within the permissible 10% threshold), signaling aggressive debt reduction but raising minor compliance concerns
- Kanishk Aluminium ↓ (BULLISH)▲
Achieved 98.9% utilization (₹2,888.06 Lakh of ₹2,920.00 Lakh) within seven months of its February 2026 IPO, with only the branding object partially deployed, indicating strong execution on core objects
- Maharaja & Speedex ↓ (BEARISH)▲
Reported Nil deviation but flagged ₹5.00 crore of working capital funds transferred to a current account causing commingling, and only ₹5.29 crore of ₹7.58 crore issue expenses verified, indicating weak internal controls
- Recode Studios ↓ (BEARISH)▲
Flagged a deviation where ₹0.08 crore of promoter selling shareholders' issue expenses were paid from fresh issue proceeds, with only ₹0.03 crore reimbursed, leaving a ₹0.05 crore shortfall (up to 10% deviation range)
- Millworks Technologies ↓ (NEUTRAL)▲
Deployed ₹101.30 crore (63.2% of ₹160.34 crore) in the first quarter post-IPO, with ₹61.94 crore toward working capital, showing rapid operational deployment but leaving 36% unspent
Risk Flags (10)
- Hero Motors↓ [MEDIUM RISK]▼
₹0.16 crore of unutilized IPO proceeds parked in a Kotak Mahindra Bank Overdraft Account, which is not as per the offer document, and the ₹200 crore capex object saw zero utilization in Q2FY27, delaying growth investments
- Sonaselection India↓ [HIGH RISK]▼
CARE Ratings flagged a deviation in the 10-15% range as ₹15.45 crore of unutilized proceeds were parked as credit balance in cash credit accounts rather than deposits with scheduled commercial banks; capex object of ₹50.61 crore saw zero deployment
- Aten Papers & Foam↓ [HIGH RISK]▼
PBT margin compressed 130 bps YoY to ~3.4% despite 51.4% revenue growth; net cash used in operating activities was ₹420.84 Lakh due to a ₹1,265.10 Lakh increase in trade receivables, and cash fell to ₹22.39 Lakh from ₹315.28 Lakh
- Maharaja & Speedex↓ [HIGH RISK]▼
Monitoring agency flagged verification gaps: ₹5.00 crore of working capital funds commingled in current account, only ₹5.29 crore of ₹7.58 crore issue expenses verified, and management certificate did not certify object-wise unutilized balances
- Recode Studios↓ [MEDIUM RISK]▼
Deviation in utilization of IPO proceeds with a ₹0.05 crore shortfall from promoter selling shareholders' expenses paid out of fresh issue, indicating weak financial controls
- Technocraft Ventures↓ [MEDIUM RISK]▼
General Corporate Purposes utilization of only ₹0.55 crore (₹40.67 crore unutilized) was not approved by the Board during Q2FY27, and CARE relied on management confirmation and statutory auditor's certificate, raising governance concerns
- Globe Civil Projects↓ [MEDIUM RISK]▼
Disclosed an income tax demand notice of ₹80.19 lakh for AY 2018-19 (under appeal) and a prosecution complaint regarding delayed TDS deposit for FY2017-18 (pending before Tis Hazari Courts, maximum liability ₹20.00 lakh)
- ENS Enterprises↓ [MEDIUM RISK]▼
Utilization remains partial with ₹16.55 crore of the ₹17.02 crore earmarked for product enhancement/manpower hiring still unutilized, and most objects still 'Ongoing' in 2026-2027, indicating slow deployment
- SS Retail↓ [MEDIUM RISK]▼
Zero utilization of ₹124.53 million fit-out capex for new stores in the first quarter post-IPO, which could delay store expansion and revenue ramp-up
- Safety Controls & Devices↓ [LOW RISK]▼
₹6.00 crore earmarked for debt repayment shown as utilized but no completed debt repayment progress reported, and ₹0.08 crore working capital balance remains unutilized in escrow
Opportunities (10)
- Hero Motors↓ (OPPORTUNITY)◆
With 63.9% of IPO proceeds (₹383.16 crore) still unutilized and a ₹200 crore capex plan for FY27, upcoming quarters could see accelerated deployment into capacity expansion, acting as a catalyst for revenue growth
- Sonaselection India↓ (OPPORTUNITY)◆
₹50.61 crore capex object remains fully unutilized but funds are parked in fixed deposits and credit balances, indicating near-term deployment; this could drive operational scale-up in H2FY27
- Technocraft Ventures↓ (OPPORTUNITY)◆
Front-loaded working capital deployment of ₹139.98 crore suggests strong order book or inventory build-up, potentially leading to revenue acceleration in H2FY27
- Belrise Industries↓ (OPPORTUNITY)◆
Full repayment of ₹15,960.21 million in borrowings is likely to reduce interest costs significantly, improving PAT margins in subsequent quarters
- Globe Civil Projects↓ (OPPORTUNITY)◆
Full utilization of IPO proceeds and a strong order book in EPC space could lead to higher revenue recognition in H2FY27, with tax issues being contingent liabilities
- Aten Papers & Foam↓ (OPPORTUNITY)◆
Despite margin compression, 51.4% revenue growth indicates strong demand; if receivables are collected and operating cash flow turns positive, profitability could improve
- SS Retail↓ (OPPORTUNITY)◆
With ₹2,067.19 million unutilized and store fit-out capex yet to begin, the company has a war chest for expansion; any announcement of store openings could act as a positive catalyst
- Kanishk Aluminium↓ (OPPORTUNITY)◆
Near-full utilization of IPO proceeds within seven months and only branding object pending, indicating efficient capital use; brand 'Baari by Kanishk' promotion could drive market share gains
- Millworks Technologies↓ (OPPORTUNITY)◆
36% of proceeds (₹58.04 crore) still unutilized with deployment ongoing through FY2026-27, providing growth capital for capex and working capital in the coming quarters
- Safety Controls & Devices↓ (OPPORTUNITY)◆
Nearly full utilization of working capital funds and no deviation, positioning the company for stable execution of its EPC order book
Sector Themes (6)
- Capex Deployment Lag◆
6 of 17 companies reported zero or negligible capex utilization in Q2FY27, including Hero Motors (₹200 crore object), Sonaselection (₹50.61 crore), SS Retail (₹124.53 million), and ENS Enterprises (₹0.75 crore IT infra), indicating a broader trend of delayed capital expenditure post-IPO, possibly due to regulatory approvals or supply chain challenges
- Working Capital Front-Loading◆
Companies like Technocraft Ventures (93.3% of target), Safety Controls & Devices (99.7%), and Millworks Technologies (₹61.94 crore) deployed working capital aggressively in the first quarter post-IPO, suggesting immediate operational needs and a focus on revenue generation over long-term assets
- Compliance and Reporting Gaps◆
5 of 17 filings (Recode Studios, Maharaja & Speedex, Hero Motors, Sonaselection, Technocraft Ventures) reported deviations or verification gaps, with issues ranging from parking funds in current/overdraft accounts to missing board approvals, highlighting weak monitoring and internal controls among SME and mainboard issuers
- Debt Repayment Priority◆
A significant portion of IPO proceeds is being used for debt reduction, with Hero Motors (₹189.84 crore), Belrise Industries (₹15,960.21 million), and Sonaselection (₹85.16 crore) leading the charge, which is likely to improve interest coverage ratios and profitability in the near term
- SME vs Mainboard Utilization◆
SME IPOs (Recode Studios, Maharaja & Speedex, Safety Controls, Kanishk Aluminium, Logiciel Solutions, ENS Enterprises) show a mix of full utilization and compliance issues, while mainboard IPOs (Hero Motors, Technocraft Ventures, SS Retail, Belrise Industries) generally have larger unutilized portions, indicating scale-related deployment challenges
- Margin Pressure in Growth Companies◆
Aten Papers & Foam's 51.4% revenue growth with 130 bps margin compression and negative operating cash flow exemplifies a trend where growth is being driven by looser credit terms (receivables up ₹1,265.10 Lakh), which could strain liquidity if not managed
Watch List (8)
-
Monitor deployment of the ₹200 crore capex object, which saw zero utilization in Q2FY27; any announcement of capex commencement could be a positive catalyst, while further delays may raise concerns
-
Watch for deployment of the ₹50.61 crore capex object in H2FY27; CARE's deviation flag on parking of funds in credit balances needs resolution to avoid regulatory scrutiny
-
Store fit-out capex of ₹124.53 million is fully unutilized; watch for announcements of new store openings or expansion plans, which could drive revenue growth in FY28
-
Monitor operating cash flow and receivables in H2FY27; if the company fails to collect receivables, liquidity could become a concern despite revenue growth
-
Watch for corrective actions on commingling of funds and verification of issue expenses; any further regulatory notices could impact stock price
-
Board approval for General Corporate Purposes utilization is pending; monitor for board resolution in Q3FY27, which would clear the governance overhang
-
Track the income tax appeal and TDS prosecution case; any adverse ruling could result in a liability of up to ₹1 crore, impacting profitability
-
The ₹0.05 crore deviation is minor but indicates weak controls; watch for reimbursement of the shortfall and any further deviations in the next monitoring report
Filing Analyses
(17)
14-11-2026
Recode Studios Ltd filed a Monitoring Agency Report from CARE Ratings for the quarter ended September 30, 2026, covering utilization of its ₹39.55 crore SME IPO proceeds (issue period May 5–7, 2026). Of the total, ₹35.91 crore was utilized and ₹3.64 crore remained unutilized in a Kotak Mahindra Bank monitoring account. However, the report flags a deviation: the company paid ₹0.08 crore of promoter selling shareholders' issue expenses out of fresh issue proceeds, of which only ₹0.03 crore was reimbursed, leaving a ₹0.05 crore shortfall (range of deviation up to 10%).
- · IPO was an SME initial public offer with issue period May 5, 2026 to May 7, 2026
- · Company belongs to the Beauty and Personal Care sector
- · Monitoring Agency Agreement dated February 24, 2026
- · Chartered Accountant certificate from R M S G & Associates dated November 05, 2026
- · Government/statutory approvals related to objects are still under process as per the offer document
- · Deviation was also reported in the previous monitoring agency report dated July 14, 2026 and continues
- · No change in means of finance or material deviation requiring shareholder approval
- · General corporate purposes had zero utilization at beginning of quarter, with ₹2.84 crore utilized during the quarter
- · Issue related expenses showed negative utilization of ₹0.03 crore during the quarter
14-11-2026
Maharaja & Speedex India Ltd (BSE scrip code 544925) filed the CARE Ratings monitoring agency report for its ₹64.10 crore SME IPO (issue period September 10–15, 2026; allotment September 16, 2026) for the half year ended September 30, 2026, reporting Nil deviation from the objects of the issue. However, the monitoring agency flagged verification gaps: ₹5.00 crore of working capital funds was transferred to the company's current account causing commingling of funds, and of ₹7.58 crore in issue-related expenses only ₹5.29 crore could be verified via bank statements, with no independent CA/management certificate confirmation. The management certificate also did not certify object-wise unutilized balances or the quarter-end balance for Q2FY27.
- · Issue period: September 10, 2026 to September 15, 2026; allotment date September 16, 2026
- · BSE scrip code: 544925; CIN: U28997DL2006PLC146383
- · Monitoring Agency Agreement dated August 31, 2026; CA certificate from APV & Associates dated November 02, 2026
- · No revision in the original cost of any object as disclosed in the Offer Document
- · This is the first monitoring agency report; no prior reports for comparison
- · No material deviation requiring shareholder approval; no change in means of finance
- · No government/statutory approvals required for the objects
- · Company formerly known as Maharaja & Speedex India Private Limited
14-11-2026
Safecure Services Limited filed its Regulation 32 statement of deviation/variation for the quarter ended September 30, 2026, confirming that the entire IPO proceeds of ₹30,60,00,000 (₹3,060.00 lakh) raised via 30,00,000 equity shares at ₹102 per share (allotted November 3, 2025) have been fully utilized with no deviation or variation from the Prospectus objects dated October 18, 2025. Allocations were fully deployed: ₹475.00 lakh for repayment of Company borrowings, ₹350.00 lakh for subsidiary borrowings, ₹1,300.00 lakh for working capital, ₹450.00 lakh for general corporate purposes, and ₹485.00 lakh for issue expenses, leaving ₹0.00 unutilized. The utilization was certified by HRJ Associates (FRN 138235W), with no monitoring agency appointed and no auditor comments; the filing is a routine compliance disclosure with no negative or declining metrics reported.
- · Issue price was ₹102 per equity share, including a premium of ₹92 per share on face value of ₹10 each
- · Prospectus dated October 18, 2025; allotment date November 3, 2025
- · BSE Scrip Code 544596; ISIN INE0SVZ01015; CIN L93030MH2012PLC237385
- · No monitoring agency was appointed for the issue
- · Audit Committee noted no deviation in utilization; auditors had no comments
- · Utilization certificate issued by HRJ Associates, FRN 138235W, UDIN 26123006ZROLEM4182, dated November 14, 2026
- · Filing signed by Shailendra Mahesh Pandey, Chairman and Managing Director, at Thane
14-11-2026
Aten Papers & Foam Limited reported H1 FY27 revenue from operations of ₹10107.06 Lakh, up 51.4% YoY from ₹6675.72 Lakh, while profit after tax rose 14.8% to ₹260.83 Lakh from ₹227.11 Lakh. However, profitability lagged the top line — PBT margin compressed sharply to ~3.4% from ~4.7% YoY as purchase of stock-in-trade and finance costs rose, and EPS declined to ₹2.53 from ₹2.56. The board also approved the Regulation 32 statement confirming no deviation in utilization of the ₹3168.00 Lakh IPO proceeds raised on 20-06-2025, though the entire amount remains unutilized as of 30-09-2026.
- · PBT margin compressed to ~3.4% in H1 FY27 from ~4.7% in H1 FY26 despite revenue growth
- · Net cash used in operating activities was ₹420.84 Lakh in H1 FY27, driven by a ₹1265.10 Lakh increase in trade receivables
- · Cash and cash equivalents fell to ₹22.39 Lakh as at 30-Sep-2026 from ₹315.28 Lakh as at 31-Mar-2026
- · Trade receivables rose to ₹6913.29 Lakh as at 30-Sep-2026 from ₹5648.19 Lakh as at 31-Mar-2026
- · IPO proceeds of ₹3168.00 Lakh raised on 20-06-2025 remain fully unutilized across all objects as of 30-Sep-2026, with no deviation reported
- · Company operates a single reportable segment (Kraft, Waste and other Paper related Products) and is exempt from Ind AS as an SME-listed entity
- · No investor complaints pending as on date of results
- · Limited Review Report issued by Alvi & Associates with no material misstatement noted
14-11-2026
Technocraft Ventures Ltd filed its first Monitoring Agency Report (by CARE Ratings) for the quarter ended September 30, 2026, covering utilization of its ₹201.51 crore IPO (issue period August 07–11, 2026). Of the gross proceeds, ₹150.78 crore was utilized as at quarter end, leaving ₹50.73 crore unutilized, with no deviation from stated objects. Working capital deployment of ₹139.98 crore against the ₹150 crore FY27 target was front-loaded into Q2FY27, leaving only ₹10.02 crore unutilized for that object, while General Corporate Purposes saw just ₹0.55 crore used (₹40.67 crore unutilized) and issue expenses ₹10.25 crore used (₹0.04 crore unutilized).
- · Issue period: August 07, 2026 to August 11, 2026; scrip code 544864, trading symbol TECHNOCRAF
- · No deviation from objects of the issue; range of deviation Not Applicable
- · Board approval for utilization under General Corporate Purpose during Q2FY27 was not received; CARE relied on management confirmation and statutory auditor's certificate
- · Monitoring Agency Agreement dated February 11, 2026; this is the first Monitoring Agency Report
- · Statutory auditor's certificate dated November 13, 2026 issued by Rishi Kapoor & Company
- · Report reviewed by Audit Committee and Board on November 14, 2026
- · Company cites healthy order book position and sound financial standing for future funding via internal accruals
- · Sector: Engineering, Procurement, Construction (EPC)
14-11-2026
Kanishk Aluminium India Ltd filed its Regulation 32 statement of deviation/variation for the quarter ended September 30, 2026, confirming no deviation or variation in the use of its IPO proceeds. The company raised ₹ 2,920.00 Lakh (₹ 29,20,00,000) via an IPO of 40,00,000 equity shares at ₹ 73 per share (face value ₹ 10), allotted February 2, 2026. Of the total, ₹ 2,888.06 Lakh was utilized as of September 30, 2026, leaving ₹ 31.94 Lakh unutilized — with branding/promotion of brand 'Baari by Kanishk' the only partially deployed object at ₹ 47.81 Lakh of ₹ 79.75 Lakh allocated, while all other objects were fully utilized.
- · Scrip Code 544693; ISIN INE163401016; NSE Symbol KANISHK
- · Prospectus dated January 20, 2026; allotment date February 2, 2026
- · No monitoring agency was appointed for the issue
- · Audit Committee noted no deviation in utilization of IPO proceeds
- · Auditors (Mahaveer Gandhi & Associates, FRN 010756C) issued a certificate confirming no deviation or variation
- · Company CIN: L27109RJ2018PLC063198; registered office at Plot No. E-849 A, Fourth Phase RIICO, Boranada, Jodhpur-342001, Rajasthan
- · Entire unutilized amount was subsequently fully utilized towards branding, promotion and marketing of 'BAARI BY KANISHK' as of the certificate signing date
14-11-2026
Safety Controls & Devices Ltd filed a Monitoring Agency Report from Infomerics Valuation and Rating Limited confirming full utilization of its ₹48.00 crore IPO proceeds (60,00,000 equity shares at ₹80 each) for the half year ended September 30, 2026, with no deviation from stated objects. Of the ₹42.24 crore net proceeds, ₹42.16 crore was utilized leaving ₹0.08 crore unutilized (parked in escrow), while working capital deployment of ₹31.42 crore against a ₹31.50 crore target left a small ₹0.08 crore gap. The report is largely routine and clean, though the minor unutilized working capital balance and the absence of any completed debt repayment progress (₹6.00 crore earmarked but shown as utilized) warrant monitoring.
- · IPO issue period was April 06, 2026 to April 08, 2026; prospectus dated April 09, 2026
- · Company is engaged in EPC activities with working capital-intensive operations and government clients
- · Monitoring Agency Agreement dated July 12, 2025
- · Statutory auditor CA certificate dated November 09, 2026; management declaration dated November 10, 2026
- · Monitoring agency conducted site visit at Lucknow head office on October 30, 2026
- · Debt repayment object (₹6.00 Cr) shown as fully utilized; completion targeted FY27
- · Working capital object completion status listed as 'Ongoing' with target FY27
- · No change in means of finance and no major deviation from earlier monitoring reports
- · BSE scrip code 544746
14-11-2026
Belrise Industries Limited submitted its Monitoring Agency Report from CRISIL Ratings for the quarter ended September 30, 2026, covering utilization of proceeds from its IPO (issue size ₹21,500 million, held May 21–23, 2025) and a QIP. No deviation from the objects of the issue was reported, with ₹21,431.77 million of the ₹21,500.00 million gross proceeds utilized and ₹68.23 million remaining unutilized (held in ICICI Bank monitoring and public issue accounts). The borrowings repayment object was fully utilized at ₹15,960.21 million, while General Corporate Purposes had ₹4.61 million unutilized and Issue Expenses had ₹63.62 million unutilized; no delays or unfavorable events were flagged.
- · Scrip Code: 544405; NSE Symbol: BELRISE; ISIN: INE894V01022
- · IPO issue period: Wednesday, May 21, 2025 to Friday, May 23, 2025
- · Industry/sector: Auto Components & Equipments
- · Monitoring Agency Agreement dated May 15, 2025
- · Peer-reviewed independent chartered accountant certificate dated October 28, 2026 issued by M/s GMKS & Co (FRN: 139767W)
- · No deviation from objects of the issue and no delay in implementation reported
- · No material deviation, no change in means of finance, and no unfavorable events affecting viability of objects
- · Borrowings repayment object fully utilized till quarter ended September 30, 2025
- · No utilization of GCP or issue expenses during the reported quarter
- · Company address: Plot No D-39 MIDC Area, Waluj Aurangabad 431133, Maharashtra, India
14-11-2026
Logiciel Solutions Ltd (formerly Logiciel Solutions Private Limited), listed on BSE SME under Scrip Code 544625 and ISIN INE1BA901016, submitted a Statutory Auditor's certificate on utilisation of IPO proceeds as on 30th September, 2026, in compliance with Regulation 262(5) & (6) of SEBI ICDR Regulations, 2018. The disclosure was triggered because working capital was one of the issue objects and the amount raised for that object exceeded ₹5 Crore. The filing itself contains no financial performance data, so no period-over-period comparison is possible.
- · Scrip Code: 544625; ISIN: INE1BA901016; CIN: L72900PB2011PLC035275
- · Filing made under Regulation 262(5) & (6) of SEBI (ICDR) Regulations, 2018
- · Utilisation certificate from Statutory Auditor is as on 30th September, 2026
- · Registered address: #11, Prem Nagar, Islam Ganj, Ludhiana – 141008, Punjab
- · Filing dated 14-11-2026 and digitally signed by Geetanjali Nerchehal at 12:54:53 +05'30'
14-11-2026
SS Retail Ltd submitted its CRISIL Ratings-issued Monitoring Agency Report for the quarter ended September 30, 2026, covering utilization of its ₹3,600.00 million IPO proceeds (net proceeds ₹3,335.55 million after issue expenses of ₹264.45 million). Of the total, ₹1,532.80 million was utilized during the quarter, leaving ₹2,067.19 million unutilized, with no deviation from stated objects. However, the fit-out capex for new stores saw zero utilization during the quarter (₹124.53 million fully unutilized), and the filing disclosed a clerical correction to the working capital object amount from ₹2,413.47 million to ₹2,413.48 million.
- · Fit-out capex for new stores had zero utilization during the quarter, with the full ₹124.53 million remaining unutilized
- · Working capital object amount was corrected from ₹2,413.47 million to ₹2,413.48 million due to a clerical error, approved by Board resolution dated November 14, 2026
- · General Corporate Purposes of ₹797.54 million was fully utilized during the quarter and does not exceed the 25% cap (₹900.00 million) of gross proceeds
- · Unutilized proceeds of ₹2,067.19 million are deployed in fixed deposits across HDFC Bank, Axis Bank and ICICI Bank, plus balances in public issue and monitoring accounts
- · No deviation from objects of the issue and no change in means of finance reported
- · IPO issue period was September 16, 2026 to September 18, 2026; Monitoring Agency Agreement dated September 08, 2026
- · Company operates 503 stores across India as of March 31, 2026, with plans for 57 new stores in FY2027 and 58 in FY2028
- · Company has not encumbered any unutilized funds as lien
14-11-2026
SS Retail Ltd filed its Regulation 32 statement of deviation/variation for the quarter ended September 30, 2026, reporting no deviation or variation in the use of IPO proceeds. The company raised ₹359,99,99,175 (₹3600.00 million gross) via an IPO of 11,805,959 equity shares at ₹424 per share (face value ₹10, premium ₹414), listing on BSE and NSE on September 23, 2026. Of the gross proceeds, ₹1532.80 million was utilized during the quarter (₹1399.31 million of net proceeds plus ₹133.50 million issue expenses), leaving ₹2067.19 million unutilized and parked in bank accounts, deposits, bonds and commercial paper; notably, ₹124.53 million earmarked for fit-out capex on new stores saw zero utilization during the quarter.
- · Monitoring agency applicable: Crisil Ratings Limited
- · Audit Committee reviewed the statement via resolution by circulation passed on Friday, November 13, 2026; Audit Committee comments: NIL; auditor comments: NIL
- · Funds raised on September 21, 2026; shares listed on BSE and NSE on September 23, 2026
- · Fit-out capex object of ₹124.53 million had zero utilization during the quarter (₹124.53 million fully unutilized)
- · General corporate purposes allocation of ₹797.54 million was fully utilized during the quarter, leaving ₹0 unutilized
- · Unutilized proceeds temporarily invested/parked in bank accounts, deposits, bonds and commercial paper
- · Disclosure made under Regulation 32(3) of SEBI LODR and SEBI Circular CIR/CFD/CMD1/162/2019 dated December 24, 2019 read with SEBI Master Circular dated January 30, 2026
- · Statement available on company website www.ssmobile.com under 'Investor Relations'
- · Scrip Code: 544934; Symbol: SSRETAIL; ISIN: INE1EQW01028; Place: Kolhapur
14-11-2026
Millworks Technologies Ltd filed its first Monitoring Agency Report (by Brickwork Ratings) for the quarter ended September 30, 2026, confirming no deviation from the objects of its ₹160.34 Crore fresh IPO issue. Of the total proceeds, ₹101.30 Crore was utilized during the quarter (₹28.73 Cr capex, ₹61.94 Cr working capital, ₹2.82 Cr GCP, ₹7.81 Cr issue expenses), leaving ₹58.04 Crore unutilized. No delays, no change in means of finance, and no unfavourable events were reported, though deployment remains ongoing through FY2026-27 with roughly 36% of proceeds still unspent.
- · No deviation from objects of the issue; range of deviation Not Applicable
- · No change in means of finance for disclosed objects
- · No major deviation observed over earlier monitoring agency reports (first report)
- · No unfavourable events affecting viability of objects reported
- · All Government/statutory approvals related to objects obtained
- · Anchor investor issue window: July 13-16, 2026; other investors: July 14-16, 2026
- · Prospectus dated July 13, 2026; Monitoring Agency Agreement dated June 03, 2026
- · Report verified by Vishnu Daya & Co LLP, Chartered Accountants, FRN No. 008456S, CA certificate dated November 13, 2026
- · Scrip Code 544826; Symbol: Millworks; CIN U29200KA2021PLC153863
- · Company is AS 9100D certified; sector: Industrial and Capital Goods
- · All objects (capex, working capital, GCP, issue expenses) ongoing with completion targeted up to Financial Year 2026-27; no delays reported
- · GCP utilization of ₹2.82 Cr during quarter; GCP covers strategic initiatives, brand building, operating expenses and working capital per prospectus page 90
14-11-2026
ENS Enterprises Ltd filed its First Monitoring Agency Report (by Brickwork Ratings) for the quarter ended September 30, 2026, covering utilization of proceeds from its fresh issue of equity shares sized at Rs. 33.14 crore (3,602,400 shares at Rs. 92.00 each). The agency reported no deviation from the objects of the issue, with the largest deployment being Rs. 6.00 crore toward IT infrastructure upgradation and Rs. 4.70 crore toward general corporate purposes. However, utilization remains partial — Rs. 16.55 crore of the Rs. 17.02 crore earmarked for product enhancement/manpower hiring is still unutilized, and Rs. 0.75 crore of IT infrastructure funds and Rs. 0.20 crore of GCP funds remain unspent, with most objects still 'Ongoing' in 2026-2027.
- · Issue period: Anchor Investor August 13, 2026; other investors August 14–18, 2026
- · Monitoring Agency Agreement dated June 19, 2026
- · Company belongs to Software and IT Services sector
- · Repayment of borrowings object fully completed; all other objects ongoing in 2026-2027
- · No material deviation, no change in means of finance, no unfavorable events affecting object viability
- · CA certificate and company statement dated October 1, 2026 verify utilization details
- · Company CIN: U74120UP2016PLC075577; registered office in Noida, Uttar Pradesh
- · Scrip Code: 544876
14-11-2026
Encash Entertainment Ltd, listed on the BSE SME Platform, filed a letter dated 14.11.2026 informing the exchange that Regulation 23(9) of SEBI (LODR) Regulations, 2015 on Related Party Transaction disclosures for the half year ended 30th September 2026 is not applicable to it. The company cited Regulation 15(2), noting its paid-up equity capital does not exceed ₹10 Crore and net worth does not exceed ₹25 Crore, and that it is SME-listed. The filing is a routine compliance clarification with no financial performance data disclosed.
- · Filing pertains to the half year ended 30th September 2026
- · Exemption claimed under Regulation 15(2) of SEBI (LODR) Regulations, 2015 for SME-listed entities
- · Corporate governance provisions under regulations 17, 17A, 18-27 and specified clauses of regulation 46 and Schedule V are stated as not applicable
- · Company CIN: L92413WB2008PLC124559; GSTIN: 19AADCB4721B1Z5
- · Registered address: 12, Free School Street, Kolkata - 700016
14-11-2026
Hero Motors Ltd filed its first Monitoring Agency Report (by CARE Ratings) for the quarter ended September 30, 2026, covering utilization of its ₹600 crore IPO (issue period September 16-18, 2026). Of the total proceeds, ₹216.84 crore was utilized during the quarter (₹189.84 crore toward debt repayment and ₹27 crore toward general corporate purposes), leaving ₹383.16 crore unutilized. However, the report flags a deviation: ₹0.16 crore of unutilized proceeds was parked in a Kotak Mahindra Bank Overdraft Account, which is not as per the offer document, though the deviation is classified as 'Not material'; capital expenditure (₹200 crore object) and offer-related expenses (₹38.01 crore) saw zero utilization in the quarter.
- · Issue period was September 16, 2026 to September 18, 2026; scrip code 544936, symbol HEROMOTORS on BSE/NSE.
- · Monitoring Agency Agreement dated September 03, 2026; Chartered Accountant certificate from B D Bansal & Co. dated November 03, 2026.
- · Promoter group comprises various individuals and companies belonging to the Munjal Family.
- · Capital expenditure object (₹200 crore) had zero utilization in Q2FY27, with ₹200 crore fully unutilized.
- · Offer-related expenses object (₹38.01 crore) had zero utilization in Q2FY27.
- · Inorganic growth/GCP object: ₹144.99 crore remains unutilized of ₹171.99 crore.
- · Deployment schedule: debt repayment ₹190 crore in FY2027; capex ₹66 crore FY2027, ₹60 crore FY2028, ₹74 crore FY2029; inorganic growth ₹90 crore FY2027 and ₹81.99 crore FY2028.
- · All objects reported as 'Ongoing' with no delay recorded.
- · Monitoring Agency Report reviewed by Audit Committee and taken on record by Board on November 14, 2026.
- · No IPO grading assigned; no change in means of finance; no shareholder approval sought for material deviations.
14-11-2026
Globe Civil Projects Limited submitted the Monitoring Agency Report from CARE Ratings for the quarter ended September 30, 2026, confirming full utilization of its ₹119.00 crore IPO proceeds with no deviation from stated objects. However, the report disclosed two tax-related matters: an income tax demand notice of ₹80.19 lakh for AY 2018-19 (under appeal) and a prosecution complaint regarding delayed TDS deposit for FY2017-18 (pending before Tis Hazari Courts, maximum liability ₹20.00 lakh). The company utilized ₹4.69 crore during the quarter, with capital expenditure accounting for ₹2.97 crore, general corporate purposes ₹1.69 crore, and issue expenses ₹0.03 crore.
- · IPO proceeds fully utilized: ₹119.00 Cr total, with ₹114.31 Cr utilized at beginning of quarter and ₹4.69 Cr during Q2FY27.
- · Capital expenditure: original cost ₹14.26 Cr, utilized ₹2.97 Cr during quarter, fully utilized.
- · Working capital requirements: original cost ₹75.00 Cr, fully utilized before quarter.
- · General corporate purpose: original cost ₹17.13 Cr, utilized ₹1.69 Cr during quarter, fully utilized.
- · Issue related expenses: original cost ₹12.62 Cr, utilized ₹0.03 Cr during quarter, fully utilized.
- · Income tax demand notice of ₹80.19 L for AY 2018-19 disclosed on BSE on March 30, 2026; appeal filed in April 2026.
- · Prosecution complaint by Income Tax Department for delay in TDS deposit for FY2017-18; pending before Tis Hazari Courts, Delhi; compoundable with maximum liability of ₹20.00 L.
- · No deviation from objects; no material deviation observed over earlier monitoring agency reports.
- · Company confirmed that all objects were met through utilization from current accounts; some comingling of funds occurred.
14-11-2026
Sonaselection India Ltd submitted its first Monitoring Agency Report (from CARE Ratings, dated November 14, 2026) for the quarter ended September 30, 2026, covering utilization of its ₹141.57 crore IPO (issue period September 17-21, 2026). Of the total proceeds, ₹92.69 crore has been utilized leaving ₹48.88 crore unutilized; CARE flagged a deviation in the 10-15% range, as ₹15.45 crore of unutilized proceeds were parked as credit balance in cash credit accounts rather than deposits with scheduled commercial banks. The borrowing-repayment object was over-utilized at ₹85.16 crore against the stated ₹80.00 crore (a ₹5.16 crore variation within the permissible 10% threshold), while the ₹50.61 crore capex object saw zero deployment in Q2FY27 with funds parked in fixed deposits and credit balances pending deployment.
- · CARE Ratings flagged deviation in the 10-15% range in utilization of IPO proceeds
- · Capex object of ₹50.61 crore saw zero deployment in Q2FY27; ₹30.00 crore parked in SBI fixed deposits and ₹15.45 crore as credit balance pending deployment
- · Issue period was September 17-21, 2026 with anchor investor bidding date September 16, 2026
- · IPO proceeds were received near the end of Q2FY27 (issue closed September 21, 2026)
- · Chartered Accountant certificate from M/s. Pokharna Somani & Associates dated November 02, 2026
- · Scrip codes: SONA (NSE) and 544938 (BSE)
- · Company belongs to Consumer Discretionary – Textile – Garments & Apparels sector
- · This is the first Monitoring Agency Report for the company
Get daily alerts with 12 investment signals, 10 risk alerts, 10 opportunities and full AI analysis of all 17 filings
₹500/mo after a 14-day free trial — no credit card required. See pricing or explore intelligence streams.
More from: India IPO SEBI DRHP Activity Filings
🇮🇳 More from India
View all →November 07, 2026
India Pre-Market Regulatory Roundup — November 07, 2026
India Pre-Market Regulatory Roundup
November 07, 2026
India Quarterly Results BSE NSE Announcements — November 07, 2026
India Quarterly Results BSE NSE Announcements
November 07, 2026
India Merger Acquisition MCA Regulatory Filings — November 07, 2026
India Merger Acquisition MCA Regulatory Filings
November 07, 2026
India MCA Corporate Compliance Enforcement — November 07, 2026
India MCA Corporate Compliance Enforcement